Cherbourg Port facilities



The Ferry Terminal


The Cherbourg cross-Channel ferry terminal entered service on June 22, 1994. It was inaugurated on June 30, 1994, on the occasion of the 50th anniversary of the liberation of Cherbourg.
Since then, it has welcomed passengers crossing the English Channel by ferry. The first passengers to pass through the new terminal were those of the Stena Normandie.

installations-portuaires-1__


The Cross-Channel Terminal


installations-portuaires-2__


Quai de France


Quai de France is the berthing location for cruise liners.
  • Length 600 m, depth up to 14 m (chart datum)
  • Pedestrian walkway for cruise passengers
  • Direct access to the Transatlantic Station / cruise terminal


Adelte pedestrian walkway


passerelle-adelte-b-passagers-croisiere__


RO/RO ramp no. 6


  • Capacity: 120 t, linkspan width 30 m, lane width 9.8 m
  • Floating, versatile, single-deck ramp suitable for all vessels


Quai de Normandie


  • Length 500 m, depth 11 m (chart datum)
  • Passenger reception building “Pagode”

 


RO/RO ramp no. 2


installations-portuaires-4__
Berthing line 190 m, depth 8 m (chart datum)

Double-deck ramp: two traffic lanes on each deck:
  • Lower deck: linkspan width 17 m, roadway 6 m, capacity 240 t (exceptional convoy type D)
  • Upper deck: linkspan width 12 m, roadway 7 m, load capacity adapted to 2 lanes of 38 t trucks

 


RO/RO ramp no. 4


installations-portuaires-5__
Berthing line 190 m, depth 7 m (chart datum)

Double-deck ramp: two traffic lanes on each deck:
  • Lower deck: linkspan width 18 m, roadway 7 m, capacity 98 t
  • Upper deck: linkspan width 12 m, roadway 7 m, load capacity adapted to 2 lanes of 38 t trucks
 


SIVEP warehouse


This facility carries out sanitary, veterinary and phytosanitary inspections of goods and animals imported from Great Britain via cross-Channel routes following the United Kingdom’s withdrawal from the European Union.

The multimodal terminal


installations-portuaires-6__
Rail Motorway Terminal area, railway tracks and associated buildings

The terminal uses LOHR technology, allowing multiple trailers to be loaded/unloaded simultaneously onto trains up to 750 metres long.
 

  • installations-portuaires-7__
  • installations-portuaires-8__
  • installations-portuaires-9__

Objectives & impacts
  • Shift up to 20,000 trailers per year from road to rail and sea
  • Reduction of CO₂ emissions (modal shift), road congestion relief


Eastern Port – Mielles Flamands


  • Mielles yard and quay (310 m)
  • Flamands yard and quay (680 m)

    * 220 m capable of handling heavy cargo up to 15 t/m²
    * And 360 m capable of handling up to 5 t/m²


Download file: plan_general_securite_surete_port-est_mars_2025.pdf

installations-portuaires-10__
 


  • installations-portuaires-11__
    Overview of the Eastern Port
  • installations-portuaires-12__
    Eastern Port cranes

  • installations-portuaires-13__
    Eastern Port cranes
  • installations-portuaires-14__
    MRE activities
 


The Fishing Port


  • port-de-peche-4__
    Landing quay
  • port-de-peche-5__
    Tanks

  • port-de-peche-6__
    Ice silos
  • port-de-peche-7__
    Fishing pontoons